Brief introduction: After the first purify air compressor suction, compression lead to cooling pipe, compressed air through the fan cooling, the temperature is reduced, the supersaturated. Wet air out of the cooling pipe is filtered water, filtered water through the electromagnetic drain valve from the rear panel. Not completely dry air through a relief valve, and then into the washer, molecular sieve to remove the remaining water vapor. Dry air through a one-way valve, into the cylinder. Gas cylinders stored, and connected to air automatic switch. By the cylinder of gas is controlled by a pressure reducing valve output pressure to 0.20 + / - 0.02 MPa, the pressure value showed on the front panel of the pressure gauge. After decompression drying air into the washer, first in the heart of the NO converter for NO2 NO oxidation, then NO2 and O3 in activated carbon scrubber, SO2 and CO2 gas absorption. Finally, clean and dry the zero end of the gas through a filter, output from the rear panel of wear plate joint. Features: 1. Can the method of SO2, NO, NO2 and O3, CO. 2. The condensed water filter to primary filtration, wet air condensed water discharge automatically. 3. The regeneration scrubber to completely dry air, the method of high efficiency, no maintenance. 4. Zero gas through the air pressure regulator control, guarantee the stability of output pressure. 5. The built-in relief valve as overvoltage protection. 6. Automatic control of compressor start-stop air pressure switch. 7. The whole instrument automatic control by the CPU. 8. The built-in two-cylinder compressor. 9. Have to automatically start function.
Brief introduction: After the first purify air compressor suction, compression lead to cooling pipe, compressed air through the fan cooling, the temperature is reduced, the supersaturated. Wet air out of the cooling pipe is filtered water, filtered water through the electromagnetic drain valve from the rear panel. Not completely dry air through a relief valve, and then into the washer, molecular sieve to remove the remaining water vapor. Dry air through a one-way valve, into the cylinder. Gas cylinders stored, and connected to air automatic switch. By the cylinder of gas is controlled by a pressure reducing valve output pressure to 0.20 + / - 0.02 MPa, the pressure value showed on the front panel of the pressure gauge. After decompression drying air into the washer, first in the heart of the NO converter for NO2 NO oxidation, then NO2 and O3 in activated carbon scrubber, SO2 and CO2 gas absorption. Finally, clean and dry the zero end of the gas through a filter, output from the rear panel of wear plate joint.