1 Sales BG 5-150 series efficient coating machine,Manufacturer
Position: Home > > Industry specific instrument > Drug testing instrument > Coating machine > BG 5-150 series efficient coating machine

BG 5-150 series efficient coating machine

Product ID:HZYJbyj014

Price: Please inquire PDF Format
Supply Ability:20SETS/MON
Port:SHENZHEN
share:
  • Product Introduction
  • Consulting
  • Model NumberBG 5-150
    Brand NameSDTZSWYYZBSJZZ
    Payment TermsT/T, paypal
    Brief introduction:
    The whole machine is composed of main engine, heater, exhaust fan, spray system and control system.
    1, the host is the main workshop of coating machine, inside the coating drum, drum made of stainless steel mesh panels, the door is equipped with active rod, rod end is equipped with adjustable medium spray gun (10 single spray gun, two gun type 80, type 150 three gun), spray gun used Japanese imports of spray gun, the gun with automatic thimble, wide sector, the advantage of Angle is adjustable, non-stick material. The main drive system of the drum is a frequency converter controlled speed regulating machine. The two sides of the drum are equipped with hot air inlet and exhaust air ducts. The air ducts are installed with primary, middle and filter to ensure that the hot air level into the workshop reaches over 100,000.
    2. The heating fan is the heat source supply system of the main engine, which is mainly composed of low-noise axial flow fan, filter and stainless steel u-type heater. Host the hot air through the heat exchanger will be required when heated to a temperature above 80 by hot fan forced into coating machine for host production in workshop.
    3. The dust removal and exhaust fan is composed of a centrifugal fan, a dust bag filter and a dust drawer. It is mainly through the exhaust fan's work to make the work area of the coating roller form a negative pressure state, and then through the non-woven cloth bag after collecting ash exhaust emissions, and make the exhaust gas in line with the requirements of "GMP", during the dust removal exhaust fan power must be greater than the power of the heating fan.
    4. The system programmable controller (PLC) is installed on the upper part of the main machine of the coating machine, which is the control system of the whole set of equipment and electrical appliances. Whole process control, setting and display the working status of the whole unit.
    Working principle:
    BG series high efficient coating machine will be coating of tablet core within the drum of the machine controlled by programmable control system, make it continuously, continuous and repeatedly to make complex trajectory, in the process of movement, controlled by programmable control system, in accordance with the requirements of process sequence and parameters will be medium by spray gun to automatically spray mist on the surface of tablet core, at the same time provided by the hot air tank via a level 100000 clean hot air filter, penetrates the core space layer, core has spraying the surface of the medium and good contact with the hot air and gradually dry, waste gas by at the bottom of the cylinder through a duct by the exhaust fan after dust emissions,
    Thus, the core can form a solid and smooth surface film.
    Features:
    1. Input the whole process into the program control system (manual adjustment, fine adjustment and programmable).
    2. The coating operation procedure is carried out in the sealed state. The inlet air passes through the primary, middle and filtration devices, and the purifying air cleanliness meets the requirements of grade 100,000.
    3. The fan adopts low-noise fan. The noise sound pressure of the main engine in idling is not more than 75db(A), and the background noise pressure generated by the heating fan and exhaust fan at the main engine is not more than 75db(A).
    4. The exhaust device is equipped with a dust collecting and flying mechanism, which maintains negative pressure on the work area of the main machine's coating drum to make the exhaust gas meet the GMP requirements.
    5. The system programmable controller (PLC) is composed of HAKKO's process graphic display (touch screen), which has the characteristics of simple, intuitive, stable and reliable operation.
    6. The whole equipment is designed and manufactured according to the requirements of GMP, which is standard, beautiful and practical. The whole unit is a new type of coating equipment with high efficiency, energy saving, safety and easy operation.
    Technical parameters:
    Model BG-5 BG-10 BG-75 BG-150
    Production capacity 5 kg/time 10kg/ time 75kg/ time 150kg/ time
    Roller rotation speed 0-30 rpm 0-30 rpm 0-27 rpm 0-27 rpm
    Main motor power 0.37kw 0.37kw 1.1kw 2.2kw
    Blower power 0.25kw 0.25kw 0.75kw 2.2kw
    Exhaust fan power 1.1kw 1.1kw 4.0kw 5.5kw
    Main engine dimensions 110×72×150cm 111×75×154cm 120×110×170cm 157×126×195cm
     
     
  • Brief introduction:
    The whole machine is composed of main engine, heater, exhaust fan, spray system and control system.
    1, the host is the main workshop of coating machine, inside the coating drum, drum made of stainless steel mesh panels, the door is equipped with active rod, rod end is equipped with adjustable medium spray gun (10 single spray gun, two gun type 80, type 150 three gun), spray gun used Japanese imports of spray gun, the gun with automatic thimble, wide sector, the advantage of Angle is adjustable, non-stick material. The main drive system of the drum is a frequency converter controlled speed regulating machine. The two sides of the drum are equipped with hot air inlet and exhaust air ducts. The air ducts are installed with primary, middle and filter to ensure that the hot air level into the workshop reaches over 100,000.
    2. The heating fan is the heat source supply system of the main engine, which is mainly composed of low-noise axial flow fan, filter and stainless steel u-type heater. Host the hot air through the heat exchanger will be required when heated to a temperature above 80 by hot fan forced into coating machine for host production in workshop.
    3. The dust removal and exhaust fan is composed of a centrifugal fan, a dust bag filter and a dust drawer. It is mainly through the exhaust fan's work to make the work area of the coating roller form a negative pressure state, and then through the non-woven cloth bag after collecting ash exhaust emissions, and make the exhaust gas in line with the requirements of "GMP", during the dust removal exhaust fan power must be greater than the power of the heating fan.
    4. The system programmable controller (PLC) is installed on the upper part of the main machine of the coating machine, which is the control system of the whole set of equipment and electrical appliances. Whole process control, setting and display the working status of the whole unit.
Products
Analytical instruments
Physical property test
Environmental monitoring and analysis
Lab general equipment
About us
About this website
Our service
Product purchase
Contact Us

Newsletter

Make Sure you dont miss interesting happenings by joining our newsletter program.

Contact Us
+86-18620722006
instruments@instrumentstrade.com